L.E.B. Electric completed all electrical work for the new Advanced Oxidation Process (AOP)/GAC facility at the Suffolk County Water Authority’s Old Dock Well Field in Kings Park.
This state-of-the-art facility is designed to remove 1,4-dioxane, an emerging contaminant and likely human carcinogen, from Long Island’s drinking water. The AOP-GAC treatment system is the only method approved by state and local health departments for eliminating this harmful chemical.
Our team handled:
✅ All electrical installations for the facility’s core building
✅ Full electrical integration for the two new AOP systems
L.E.B. played a role in delivering safer, cleaner water to our communities through reliable electrical work that ensures our public health is strong.



