Skip to main content

Improving Traffic Operations and Safety Along Route 27 Without Disruption

Progress continues on the NYSDOT Route 27 project, where L.E.B. Electric is proud to be working alongside Rosemar Construction to improve traffic operations and safety along this major corridor.

Phase 1 of the project included the installation of 360-degree video detection systems at key intersections while phase 2 involves cutting loops into the roadway for vehicle detection and traffic signal control.

Because Route 27 is such a heavily traveled roadway, this work is being performed overnight from 10:00 PM to 6:00 AM to minimize disruptions to the traveling public while keeping our crews safe.