
Progress continues on the NYSDOT Route 27 project, where L.E.B. Electric is proud to be working alongside Rosemar Construction to improve traffic operations and safety along this major corridor.
Phase 1 of the project included the installation of 360-degree video detection systems at key intersections while phase 2 involves cutting loops into the roadway for vehicle detection and traffic signal control.
Because Route 27 is such a heavily traveled roadway, this work is being performed overnight from 10:00 PM to 6:00 AM to minimize disruptions to the traveling public while keeping our crews safe.
